C&G 2391-51 Periodic Inspection & Testing

Content:  

Practices and Legislation for the periodic inspection, testing and condition reporting of electrical installations.  

  • Requirements for inspecting, and recording the condition of electrical installations

  • Requirements for completing the safe isolation of electrical circuits and installations

  • Requirements for completing the periodic inspection of electrical installations

  • Differences between periodic inspection and initial verification

  • Requirements for testing before circuits are live.

  • Requirements for testing live installations

  • Understanding and interpreting test results

  • Requirements for the completion of electrical installation condition reports

  • Carrying out inspection of electrical installations prior to them being put into service

  • Produce a condition report with recording observations and classification

 

In order to claim the full 2391-51 qualification, students must complete the following 3 units:

⦁    On-Line multiple choice exam – 60-Question, Open Book

⦁    1.5 Hour Written Exam (pre-set by the City & Guilds)

⦁    Practical Assessment (2Hours)

 

Practical/theory Assessments 1.  Visual inspection (30 minutes) – closed book. 2.  Electrical Condition Report and test (1 hours 30 minutes plus 30 minutes to complete paperwork) – open 

Required Literature:

17th Edition - BS 7671:2011 with amendment 1

Guidance Note 3, Inspection and Testing with amendment 3

To book a place on the C&G 2391-51 course select your start date below and follow the booking procedure.
All fees below include the exam fee.







Contact Us:

Unit 28
Appin Road
Argyle Trading Estate
Wirral
CH41 9HH

Tel: 0151 342 2985
Mob: 07747 337 685

This email address is being protected from spambots. You need JavaScript enabled to view it.